|
An extra large, hermetically
sealed chamber for the safe and controlled development
of latent fingerprints by cyanoacrylate (superglue) fuming.
Features include:
- large capacity
for treating doors & car parts
- automatic operation
- comprehensive
health & safety
features
- internal fume cleansing
Extra capacity
The extra large capacity of the MVC-5000 fuming cabinet
increases laboratory efficiency by enabling more and larger
items to be treated per cycle. Full size domestic doors and
car seats easily fit inside the chamber, which has an internal
volume of 2 cubic metres and internal height of over 2 metres.
Hanging rails and removable shelves are also provided for
smaller items.
Foster Freemans rugged design ensures a long working
life. The walk-in chamber is constructed of a robust anodised
aluminium frame and fitted with
toughened glass windows, which are easy to clean and provide excellent all
round visibility, enabling the operator to monitor print development on every
item.
Automatic or Manual operation
Operation under automatic control, the processes of humidification,
fuming and fume cleansing proceed without operator intervention
according to a preset programme. Under manual control each
phase of the process is initiated seperately, enabling the
operator to extend or reduce the fuming process for best
results.
During the development process fans continually circulate
the atmosphere to ensure even development while sensors monitor
and control the internal humidity to maintain optimum conditions.
Self-contained fume cleansing system
The MVC 5000 utilises two internal, high capacity, fan
driven, activated carbon filters to cleanse the chamber after
fuming. The system is low maintenance, only required filter
replacement after every 80 cleansing cycles
Health & Safety
features
Properly maintained, the MVC 5000 will provide a safe
working environment for the operator, ensuring exposure to
cyanoacrylate vapour is below the Occupational Exposure Standard
required by the UK Health and Safety Executive, currently
0.3ppm. Following installation, by the company's engineers,
each instrument is tested to provide proof of compliance
to the safety standard.
Service and maintenance
To ensure continued safe operation, regular maintenance
contracts are available.
Please consult our sales office for details.
Back
|